About the ProjectThe Village of Algonquin is continuing to implement the Downtown Revitalization Plan and provide physical improvement and beautification to the downtown area. The plan created a vision to enhance the characteristics of the area and attract visitors and businesses to the downtown. The next phase of the project will address Harrison and Washington streets and bring the same charm and character from Main Street to these adjacent roadways. The Village is also incorporating a flex-street design on Washington Street between Harrison and Main streets. This design includes no raised curb and is intended to provide a more pedestrian friendly atmosphere that can better accommodate public gatherings and events. Additionally, on that same stretch of road, there will be catenary lighting that spans above the road to enhance the nighttime ambiance.
|
Construction Updates
April 20, 2024
Stage One of the Washington and Harrison Streetscape Project continues!
Over the last two weeks, the contractor has removed the existing concrete curb, sidewalks and asphalt pavement on West Washington Street. In addition, the contractor has removed the existing ramp at Bullseye Pub and the new ADA compliant ramp has been poured. Measurements for the new ramp were taken so that the railing could be built, however a temporary railing will be installed so the ramp can be accessible in the coming weeks. |
Asphalt removal on West Washington Street
|
Next week, the temporary wooded railing for the ADA accessible ramp at Bullseye Pub will be installed.
On the south side of West Washington Street the contractor will also:
The contractor will also remove the existing storm sewer and install new storm sewer on the north side of West Washington Street. |
Finishing the new ADA ramp at Bullseye Pub
|
Spring 2024
|
Summer 2024
June 2024
July 2024 August 2024 |
Fall 2024
September 2024
October 2024 November 2024 |
|
|